We met with the propane company today to do a site survey for where we'll put the tank. It'll be behind the house kind of hidden in the trees, and we're leaning towards a 250gal tank. Should be enough to last us at least a year or more, depending on hot water usage and how cold the winter gets this year. Both our domestic hot water and hydronic (radiant floor) heat is coming from a Rinnai tankless condensing water heater.
Appliances are in and waiting at the warehouse for the project to get to that point. Same with kitchen cabinets and countertops. So there's that. The bathroom has been roughed in, and 90% of the plumbing is in as is most of the wiring now:
Some progress outside too:
Deck going in, with gable over door, most of the window trim and flashing is on now too, as it progressed
Kinda looks like a house now!
And they've started with some of the insulation inside too. 10" of spray foam!
That's all for now, the little pup is too tired to keep working