And Amerigas placed the propane tank
Since Wednesday, all of the drywall has been taped, smoothed, and textured. Today we met with our builder and picked out the last of the interior items needed for finishing (flooring for the 1st floor, all light fixtures, all door hardware, closet hardware, pantry racks, doors, bathroom vanity, faucets, and more). We did figure out one big unfortunate change... downstairs we won't be able to have a pocket door on the half bath. There's just not enough wall space and none of us caught it until it was already built. Unfortunately that means the wall in front of the half bath gets to get re-framed and drywalled. :( Overall, not a huge set back but still annoying.
Flooring goes in this week, then paint and trim, then kitchen and appliances. Still on track to be finished by the first week of November, meaning we'll go through closing while Rebecca and I are on our honeymoon in Tahiti while the bank does it's thing.